Penmann recently finalised a complex HVAC upgrade at Nutricia’s Liverpool-based production site, providing a bespoke ventilation and climate control system engineered to meet stringent hygiene and production criteria. The scope encompassed the design, supply, installation and commissioning of cutting-edge HVAC systems across civil, Medium Care (MC) and High Care (HC) https://baidubookmark.com/story20496559/penmann-ltd-finalises-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2