For that reason, the metro authority needed to evacuate the people, leading to huge delays and sluggish advancement in the development with the metro railway in that region.[167] The least qualification demanded may differ according to the put up. Check with Annexure A in the thorough notification for specific prerequisites. https://israelftcmw.ssnblog.com/31343840/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf